Big relief for Delhi commuters! 12 junctions, 20% diversion and 6 Metro upgrades
Delhi approves a 5.5-km elevated corridor to bypass 12 junctions, a Mukarba Chowk plan targeting 20% traffic diversion and access upgrades at six Metro stations.
- Sep 26, 2026,
- Updated Sep 26, 2026 6:00 AM IST

- 1/5
Junction Bypass
A new 5.5-km elevated corridor on Maa Anandmayee Marg could let through-traffic bypass around 12 intersections between Outer Ring Road and Mehrauli-Badarpur Road, potentially changing how commuters move through one of South Delhi's busy stretches.

- 2/5
The Okhla Corridor
The corridor is designed to tackle congestion on a road carrying substantial traffic linked to Okhla Phase I and II industrial areas. The plan also includes an underpass and roundabout at the Crowne Plaza intersection on Okhla Estate Marg.

- 3/5
Traffic Shift
The Mukarba Chowk plan takes a different approach: widen the existing Outer Ring Road ROB from six to 10 lanes and build a new four-lane ROB over the Delhi-Sonipat railway line. The new link is expected to divert around 20% of existing traffic.

- 4/5
Metro Access
Six Delhi Metro stations are also getting multimodal access plans covering roughly 300 metres around each station. The focus is on the often-tricky final stretch of a journey, with better walking routes, last-mile connectivity, safety and interchange between transport modes.

- 5/5
All Cleared
With the latest approvals for GTB Nagar, Sarita Vihar, Akshardham, Rohini West, Malviya Nagar and Shastri Park, all 31 MMI plans prepared by DMRC for its Phase I and Phase II corridors have now received UTTIPEC approval.
