Delhi to Nepal in 8 hours: India’s Gorakhpur–Sonauli highway is 89% complete — here’s what’s coming
The Gorakhpur-Sonauli NH-24 is 89% complete — a four-lane, ATMS-equipped highway that will allow Delhi-to-Nepal travel in around 8 hours. Here's everything about India's cross-border road project.
- Jul 30, 2026,
- Updated Jul 30, 2026 6:00 PM IST

- 1/6
The existing two-lane road witnesses long traffic jams, especially during peak travel seasons. The new four-lane highway will ease congestion, improve safety and make travel significantly smoother for the thousands of tourists, pilgrims, traders and cargo vehicles that use the route daily. (Representative image)

- 2/6
For travellers from Delhi, Noida, Ghaziabad and Lucknow, the new highway is expected to reduce travel time considerably — allowing travellers to reach the Nepal border from Delhi in around eight hours under normal traffic conditions. (Representative image)

- 3/6
The four-lane Gorakhpur-Sonauli National Highway (NH-24) — one of India's key international road projects — is in its final phase of construction, with NHAI confirming that approximately 89% of the work on the 79.5-km highway has been completed. (Representative image)

- 4/6
The corridor features a railway bridge, two flyovers, 24 underpasses, more than 100 culverts and nearly 68 km of service roads — alongside an Advanced Traffic Management System (ATMS) with CCTV cameras, emergency call boxes, electronic message boards and real-time traffic monitoring.

- 5/6
The highway is currently being developed as four lanes — but has been planned to allow expansion to six lanes if traffic increases in the coming years, future-proofing the investment against the growing cross-border movement between India and Nepal. (Representative image)

- 6/6
The highway is expected to boost tourism to Lumbini — the birthplace of Lord Buddha — and strengthen trade ties between the two countries. Sonauli serves as a major gateway for goods between India and Nepal, and better connectivity will reduce transportation delays and logistics costs significantly.
